Every three years, Florida updates its building and fire codes, and the 2026 Florida Building Code changes take effect for projects submitted for permit on or after January 1, 2027. Projects submitted for permit on or after January 1st will be reviewed under the 9th Edition (2026) of the Florida Building Code (FBC) and the 2026 Florida Fire Prevention Code.
For multifamily owners and developers, the good news is that this cycle brings relatively minor changes. Still, some revisions may affect design decisions or construction costs, particularly for projects already in design that won't reach permit submission until after the new year. FORUM has reviewed the updated codes with an eye toward multifamily work in Florida, and our engineering partners have completed their own discipline-specific analyses. Here are the changes we believe are most significant.
Fire-Rated Wall Continuity at Floor Assemblies (FBC 705.6 and 705.6.1)
New sections clarify how fire-rating continuity works where floor and ceiling assemblies meet and support exterior walls. In Type III-A construction, the 2-hour rating on the interior side of exterior walls must now clearly continue into the floor/ceiling cavity up to the underside of the floor sheathing above, unless the floor/ceiling itself is designed as a 2-hour system. Wood floor framing located within the plane of the wall must also be fire-retardant-treated (FRT) lumber.
Impact: None for FORUM projects. Detailing for this condition has historically varied among designers and contractors, but the new language confirms the interpretation FORUM has already been applying.
Elevator Hoistway Opening Protection (FBC 708.4.1, 709.4.2, 710.4.1, and 3006.2)
To better limit smoke movement through elevator shafts, the code now requires added protection at elevator openings located within corridors of buildings four or more stories tall. Projects can comply in one of three ways:
- An enclosed elevator lobby with doors on either side, which may be held open magnetically and released by the fire alarm system
- A door directly outside each hoistway opening
- A recessed, concealed smoke curtain directly outside each hoistway opening
These requirements don't apply where elevators open directly to the exterior. Protection can also be omitted at the level of exit discharge (typically the ground floor) when the building has a full NFPA 13 sprinkler system, as opposed to NFPA 13R.
Impact: This is the most notable change of the cycle. Where it applies, it will affect both design and construction cost, and general contractors will determine actual costs through estimating as impacted designs progress.
Single-Exit Allowances for Occupied Roofs (FBC Tables 1006.3.2, 1006.3.3(1), and 1006.3.3(2))
The tables governing which floors and spaces may be served by a single exit now address occupied roof spaces. The updated language more clearly defines when a rooftop amenity area meeting specific exception requirements can be served by one exit.
Impact: Greater clarity for projects featuring rooftop amenities, which continue to be a popular differentiator in multifamily design.
Planning Ahead
Beyond these highlights, the 2026 codes include many smaller changes expected to have negligible impact. Timing is the key factor: if your project is in design now and permit submission will likely fall after January 1, 2027, this is the right moment to confirm whether any updates apply. Addressing them early is far simpler than revising drawings mid-review.
Wondering how the 2026 code might affect your project? Contact the FORUM team. We're happy to walk through your plans and help you stay ahead of the change.
FAQs
The 9th Edition (2026) Florida Building Code and Florida Fire Prevention Code apply to all projects submitted for permit on or after January 1, 2027. Projects permitted before that date remain under the current code, so timing your permit submission matters if your project is already in design.
The new elevator opening protection requirement is the most significant. Buildings four or more stories with elevators opening into corridors must now include added smoke protection, such as an enclosed elevator lobby, doors at each hoistway opening, or concealed smoke curtains. Where it applies, this affects both design and construction cost.
Yes. The requirements don’t apply when an elevator opens directly to the exterior. Protection can also be omitted at the level of exit discharge, typically the ground floor, when the building has a full NFPA 13 sprinkler system rather than NFPA 13R. Contact FORUM to find out which options and exceptions apply to your project.
Similar
Martin Manor: Rebuilding Affordable with an Eighty-Year History
Dixie Manor was among the oldest public housing communities in South Florida: born of a segregated wartime economy, sustained by generations of families, and...
Visualize Early. Design Better. Market with Impact.
At FORUM, we see visualization as a working tool, not a final step. Renderings help clients and design teams explore ideas, test massing, evaluate...